Fillable Nyc Dep Noise Mitigation Plan Form in PDF
The NYC Department of Environmental Protection (DEP) has established a Construction Noise Mitigation Plan form designed to help manage and reduce noise during construction activities. This form is essential for ensuring that construction projects comply with local noise regulations. While it does not need to be filed with the DEP, it must be posted at the construction site and made accessible to inspectors. The responsible party must provide accurate information about the project, including the work site location, contact details, and the approximate distance to the nearest noise receptor. The form also requires a detailed timeline for various construction phases, such as demolition, excavation, and finishing work. Additionally, it includes a checklist of construction devices to be used, allowing for the identification of quieter alternatives that may mitigate noise. If specific devices are used, the form outlines whether noise barriers are necessary. Ultimately, this plan serves as a proactive measure to balance construction needs with community peace, reflecting the city's commitment to environmental compliance and public well-being.
Preview - Nyc Dep Noise Mitigation Plan Form
THE CITY OF NEW YORK |
Construction Noise Mitigation Plan |
DEPARTMENT OF ENVIRONMENTAL PROTECTION |
Rev 04/2023 |
|
|
Bureau of Environmental Compliance |
|
|
|
Records Control (718) |
|
CONSTRUCTION NOISE MITIGATION PLAN |
|
MUST PRINT AND POST ON WORKSITE
The responsible party shall be liable for the accuracy of the document and compliance with all applicable rules in Title 15 Rules of the City of New York - RCNY Chapter 28.
CONTACT INFORMATION
NAME OF RESPONSIBLE PARTY AS DEFINED IN TITLE 15 RCNY
PHONE NUMBER
WORK SITE ADDRESS
BUSINESS ADDRESS
CITY
STATE
ZIP
ZIP
BOROUGH
BLOCK LOT
CONSTRUCTION INFORMATION
Approximate Distance to Closest Receptor (defined in Title 15 RCNY |
NORMAL WORK HOURS (AS DEFINED IN NYC ADMINISTRATIVE CODE |
Do you anticipate having to work at any time other than 7am to 6pm Monday to Friday?
A. ______________________ feet |
|
YES NO |
|
|
|
|
|
||
B. ______________________ feet |
If YES, please fill out Construction Alternative Noise Mitigation form and explain what phase[s] do you |
|||
C. ______________________ feet |
anticipate needing an After Hour Variance: |
|
||
Demolition |
Excavation |
Foundation |
||
D. ______________________ feet |
||||
Superstructure |
Finishing |
|
||
Other_________________________________________________________________
|
PHASES AND DURATION DATES |
NYC DEP DEMOLITION REGISTRATION # |
NYC DOT DEMOLITION PERMIT # |
|
NYC DOB PERMIT NUMBERS |
|
|||||
|
Demolition |
From |
To |
|
|
|
|
WORK |
|
DEMOLITION |
|
|
|
|
|
|
|
|
|
|
|
|
|
PHASE |
|
|
|
|
|
|
|
|
|
|
|
Excavation |
From |
To |
Estimated Depth of Excavation: |
|
|
|
|
|
|||
|
|
SOIL _______________ FEET + BEDROCK _______________ FEET = TOTAL |
0 |
|
FEET |
||||||
|
|
|
|
||||||||
|
|
|
|
|
|
|
|
|
|
|
|
CONSTRUCTION |
Foundation |
From |
To |
Pumping Operation: |
|
If YES, |
|
|
|
||
|
|
YES NO |
|
NUMBER OF INDIVIDUAL TRUCKS __________________________ PER HOUR |
|||||||
Superstructure |
From |
To |
Number of Floors / Stories: |
Describe How |
Flooring Will Be Laid: |
|
|
|
|||
|
|
|
CONCRETE PUMP PREFAB OTHER: __________________________________ |
||||||||
|
|
|
|
||||||||
Finishing |
From |
To |
COMPLETED EXTERIOR BEFORE BEGINNING INTERIOR WORK |
|
|
|
|||||
|
|
|
|
|
|||||||
|
|
|
|
INTERIOR WORK BEFORE EXTERIOR WALLS / WINDOWS ARE IN. |
|
|
|
||||
|
Other |
From |
To |
Explain: |
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Page 1 of 3
CONSTRUCTION DEVICES
List of §102 construction devices to be used at the site. When the additional devices listed below each category are utilized, the use of barriers as set forth in section IV herein is not required unless the NYC Department of Environmental Protection receives complaints as set forth in
|
DEVICE |
|
PILE |
JACKHAMMERS |
HOE RAMS |
|
BLASTING |
VACUUM |
DUMP |
CRANES |
|
CONCRETE |
SANDBLASTING |
AUGER DRILL |
OTHER |
|
|
|
|
_____________: |
|||||||||||
|
|
DRIVERS |
|
EXCAVATORS |
TRUCKS |
|
SAWS |
EQUIPMENT |
RIGS |
||||||
|
|
|
|
||||||||||||
|
|
|
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||||||||||
FOR: |
Demolition |
Demolition |
Demolition |
|
Demolition |
Demolition |
Demolition |
Demolition |
|
Demolition |
Demolition |
Demolition |
Demolition |
||
Excavation |
Excavation |
Excavation |
|
Excavation |
Excavation |
Excavation |
Excavation |
|
Excavation |
Excavation |
Excavation |
Excavation |
|||
Foundation |
Foundation |
Foundation |
|
Foundation |
Foundation |
Foundation |
Foundation |
|
Foundation |
Foundation |
Foundation |
Foundation |
|||
USED |
Superstructure |
Superstructure |
Superstructure |
|
Superstructure |
Superstructure |
Superstructure |
Superstructure |
|
Superstructure |
Superstructure |
Superstructure |
Superstructure |
||
Finishing |
Finishing |
Finishing |
|
Finishing |
Finishing |
Finishing |
Finishing |
|
Finishing |
Finishing |
Finishing |
Finishing |
|||
Other (Explain): |
Other (Explain): |
Other (Explain): |
|
Other (Explain): |
Other (Explain): |
Other (Explain): |
Other (Explain): |
|
Other (Explain): |
Other (Explain): |
Other (Explain): |
Other (Explain): |
|||
PHASE |
|
|
|||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
MAKE (s) |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vibratory Pile |
Quieter makes and |
Quieter makes and |
Blast Mats |
Smaller Capacity |
US Made European |
Modern Hydraulic |
|
|
|
|
|
|
|
|
|
Driver or Hydraulic |
models as defined in |
models as defined in |
|
|
Environmental Label |
Crane as defined in |
|
|
|
|
|
|
|
|
|
Impact Pile Driver as |
102(a)(2)(B)(i) |
102(a)(3)(B)(i) |
|
|
102(b)(1)(B)(i) |
equipment or equivalent |
102(d)(1)(B)(ii) |
|
|
|
|
|
|
|
|
defined in |
Other (Explain): |
Noise Shroud as |
|
|
Silencer as defined |
as defined in |
US Made European |
|
|
|
|
|
DETAIL |
102(a)(1)(B)(ii) |
|
defined in |
|
|
in 102(b)(1)(B)(iii) |
102(c)(1)(B)(iii) |
Environmental Label |
|
|
|
|
|
||
Noise Bellows as |
|
102(a)(3)(B)(iii) |
|
|
Other (Explain): |
Other (Explain): |
equipment or equivalent |
|
|
|
|
||||
defined in |
|
Other (Explain): |
|
|
|
|
as defined in |
|
|
|
|
|
|||
102(a)(1)(B)(viii) |
|
|
|
|
|
|
102(d)(B)(1)(iii) |
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
Other (Explain): |
|
|
|
|
|
|
Other (Explain): |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
FUEL TYPE |
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
MAXIMUM NUMBER OF UNIT TO BE USED AT THE |
SAME TIME: |
|
|
|
||||
ADDITIONAL CONSTRUCTION DEVICES
List of additional applicable construction devices to be used at the site:
GENERATORS |
COMPRESSORS |
STREET PLATES BACKUP ALARMS |
PUMPS |
HOIST |
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
NOISE MITIGATION |
|
|
|
|
|
Required to use Perimeter barrier /DOB construction fence or temporary/moveable barrier: |
|
|||||
Noise Mitigation Barriers Utilized: If required as set forth in |
|
|
|
YES |
NO |
|
|
|||||
PILE |
JACKHAMMERS |
HOE RAMS |
BLASTING |
VACUUM |
|
DUMP |
CRANES |
CONCRETE |
STREET |
AUGER DRILL |
BACKUP |
|
DRIVERS |
EXCAVATORS |
|
TRUCKS |
SAWS |
PLATES |
RIGS |
ALARMS |
|||||
|
|
|
|
|
|
|||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
Perimeter |
Perimeter |
|
Perimeter |
Perimeter |
Perimeter |
Perimeter barrier/DOB |
Perimeter |
Perimeter |
Perimeter |
Perimeter |
Perimeter |
|
barrier/DOB |
barrier/DOB |
|
barrier/DOB |
barrier/DOB |
barrier/DOB |
Construction Fence |
barrier/DOB |
barrier/DOB |
barrier/DOB |
barrier/DOB |
barrier/DOB |
|
Construction Fence |
Construction Fence |
Construction Fence |
Construction Fence |
Construction Fence |
Temporary barrier |
Construction Fence |
Construction Fence |
Construction Fence |
Construction Fence |
Construction Fence |
||
Temporary barrier |
Temporary barrier |
Temporary barrier |
Temporary barrier |
Temporary barrier |
Moveable barrier |
Temporary barrier |
Temporary barrier |
Temporary barrier |
Temporary barrier |
Temporary barrier |
||
Moveable barrier |
Moveable barrier |
Moveable barrier |
Moveable barrier |
Moveable barrier |
|
|
Moveable barrier |
Moveable barrier |
Moveable barrier |
Moveable barrier |
Moveable barrier |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Page 2 of 3
CHECK ALL THAT APPLY
Please check all equipment that will be used on site. Review Rules for Citywide Construction Noise Mitigation Section
|
LabelID |
Equipment Description |
|
|
LabelID |
Equipment Description |
|
|
LabelID |
Equipment Description |
|
A |
All Other Equipment > 5 HP |
|
|
T |
Excavator |
|
|
AM |
Refrigerator Unit |
|
B |
Auger Drill Rig |
|
|
U |
Flat Bed Truck |
|
|
AN |
Rivet Buster / Chipping Gun |
|
|
|
|
|
|
|
|
|
|
|
|
C |
Backhoe |
|
|
V |
Front End Loader |
|
|
AO |
Rock Drill |
|
|
|
|
|
|
|
|
|
|
|
|
D |
Bar Bender |
|
|
W |
Generator |
|
|
AP |
Roller |
|
|
|
|
|
|
|
|
|
|
|
|
E |
Blasting |
|
|
X |
Generator (<25KVA, VMS signs) |
|
|
AQ |
Sand Blasting |
|
F |
Boring Jack Power Unit |
|
|
Y |
Gradall |
|
|
AR |
Scrapper |
|
|
|
|
|
|
|
|
|
|
|
|
G |
Chain Saw |
|
|
Z |
Grader |
|
|
AS |
Shears (on backhoe) |
|
|
|
|
|
|
|
|
|
|
|
|
H |
Clam Shovel (dropping) |
|
|
AA |
Grapple (on backhoe) |
|
|
AT |
Slurry Plant |
|
|
|
|
|
|
|
|
|
|
|
|
I |
Compactor (ground) |
|
|
AB |
Horizontal Boring Hydr. Jack |
|
|
AU |
Slurry Trenching Machine |
|
J |
Compressor (air) |
|
|
AC |
Hydra Break Ram |
|
|
AV |
Soil Mix Drill Rig |
|
|
|
|
|
|
|
|
|
|
|
|
K |
Concrete Batch Plant |
|
|
AD |
Impact Pile Driver |
|
|
AW |
Tractor |
|
|
|
|
|
|
|
|
|
|
|
|
L |
Concrete Mixer Truck |
|
|
AE |
Jackhammer |
|
|
AX |
Vacuum Excavator |
|
|
|
|
|
|
|
|
|
|
|
|
M |
Concrete Pump Truck |
|
|
AF |
Man Lift |
|
|
AY |
Vacuum Street Sweeper |
|
N |
Concrete Saw |
|
|
AG |
Mounted Impact Hammer (hoe ram) |
|
|
AZ |
Ventilation Fan |
|
|
|
|
|
|
|
|
|
|
|
|
O |
Crane |
|
|
AH |
Pavement Scarafier |
|
|
BA |
Vibrating Hopper |
|
|
|
|
|
|
|
|
|
|
|
|
P |
Dozer |
|
|
AI |
Paver |
|
|
BB |
Vibratory Concrete Mixer |
|
|
|
|
|
|
|
|
|
|
|
|
Q |
Drill Rig Truck |
|
|
AJ |
Pickup Truck |
|
|
BC |
Vibratory Pile Driver |
|
R |
Drum Mixer |
|
|
AK |
Pneumatic Tools |
|
|
BD |
Warning Horn |
|
|
|
|
|
|
|
|
|
|
|
|
S |
Dump Truck |
|
|
AL |
Pumps |
|
|
BE |
Water Jet Deleading |
|
|
|
|
|
|
|
|
|
BF |
Welder / Torch |
|
|
|
|
|
|
|
|
|
|
|
Note: DEP will utilize the Federal Highway Administration Roadway Construction Model as a means of identifying equipment either in Section II or III, that may be the cause of a noise complaint, see
By checking this box, I certify that the information contained in this form is true and accurate.
NAME
COMPANY
DATE
BUSINESS ADDRESS
CITY
STATE
ZIP
Page 3 of 3
Form Characteristics
| Fact Name | Details |
|---|---|
| Governing Authority | This form is governed by Title 15 of the Rules of the City of New York, specifically Chapter 28. |
| Submission Requirement | It is not necessary to file the Construction Noise Mitigation Plan with the Department of Environmental Protection (DEP). |
| Posting Requirement | The plan must be posted on site or made accessible to inspectors at all times. |
| Responsible Party | The responsible party is liable for the accuracy of the document and compliance with applicable rules. |
| Work Site Information | Details required include the work site location, contact information, and approximate distance to the closest receptor. |
| Construction Phases | The form outlines various construction phases, such as demolition, excavation, and finishing, with specific date ranges. |
| Noise Mitigation Devices | Users must check applicable noise mitigation devices being utilized, including pile drivers and jackhammers. |
| Certification | The responsible party must certify the accuracy of the information by signing the form, which also requires a notary public. |