Homepage Fillable Nyc Dep Noise Mitigation Plan Form in PDF
Article Guide

The NYC Department of Environmental Protection (DEP) has established a Construction Noise Mitigation Plan form designed to help manage and reduce noise during construction activities. This form is essential for ensuring that construction projects comply with local noise regulations. While it does not need to be filed with the DEP, it must be posted at the construction site and made accessible to inspectors. The responsible party must provide accurate information about the project, including the work site location, contact details, and the approximate distance to the nearest noise receptor. The form also requires a detailed timeline for various construction phases, such as demolition, excavation, and finishing work. Additionally, it includes a checklist of construction devices to be used, allowing for the identification of quieter alternatives that may mitigate noise. If specific devices are used, the form outlines whether noise barriers are necessary. Ultimately, this plan serves as a proactive measure to balance construction needs with community peace, reflecting the city's commitment to environmental compliance and public well-being.

Preview - Nyc Dep Noise Mitigation Plan Form

THE CITY OF NEW YORK

Construction Noise Mitigation Plan

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Rev 04/2023

 

Bureau of Environmental Compliance

 

59-17 Junction Boulevard, 9th Floor, Flushing, New York 11373

 

Records Control (718) 595–3855

 

CONSTRUCTION NOISE MITIGATION PLAN

 

MUST PRINT AND POST ON WORKSITE

The responsible party shall be liable for the accuracy of the document and compliance with all applicable rules in Title 15 Rules of the City of New York - RCNY Chapter 28.

CONTACT INFORMATION

NAME OF RESPONSIBLE PARTY AS DEFINED IN TITLE 15 RCNY §28-109 EMAIL

PHONE NUMBER

WORK SITE ADDRESS

BUSINESS ADDRESS

CITY

STATE

ZIP

ZIP

BOROUGH

BLOCK LOT

CONSTRUCTION INFORMATION

Approximate Distance to Closest Receptor (defined in Title 15 RCNY §28-109)

NORMAL WORK HOURS (AS DEFINED IN NYC ADMINISTRATIVE CODE §24-222)

Do you anticipate having to work at any time other than 7am to 6pm Monday to Friday?

A. ______________________ feet

 

YES NO

 

 

 

 

B. ______________________ feet

If YES, please fill out Construction Alternative Noise Mitigation form and explain what phase[s] do you

C. ______________________ feet

anticipate needing an After Hour Variance:

 

Demolition

Excavation

Foundation

D. ______________________ feet

Superstructure

Finishing

 

Other_________________________________________________________________

 

PHASES AND DURATION DATES

NYC DEP DEMOLITION REGISTRATION #

NYC DOT DEMOLITION PERMIT #

 

NYC DOB PERMIT NUMBERS

 

 

Demolition

From

To

 

 

 

 

WORK

 

DEMOLITION

 

 

 

 

 

 

 

 

 

 

 

 

PHASE

 

 

 

 

 

 

 

 

 

 

 

Excavation

From

To

Estimated Depth of Excavation:

 

 

 

 

 

 

 

SOIL _______________ FEET + BEDROCK _______________ FEET = TOTAL

0

 

FEET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONSTRUCTION

Foundation

From

To

Pumping Operation:

 

If YES,

 

 

 

 

 

YES NO

 

NUMBER OF INDIVIDUAL TRUCKS __________________________ PER HOUR

Superstructure

From

To

Number of Floors / Stories:

Describe How

Flooring Will Be Laid:

 

 

 

 

 

 

CONCRETE PUMP PREFAB OTHER: __________________________________

 

 

 

 

Finishing

From

To

COMPLETED EXTERIOR BEFORE BEGINNING INTERIOR WORK

 

 

 

 

 

 

 

 

 

 

 

 

INTERIOR WORK BEFORE EXTERIOR WALLS / WINDOWS ARE IN.

 

 

 

 

Other

From

To

Explain:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 1 of 3

CONSTRUCTION DEVICES

List of §102 construction devices to be used at the site. When the additional devices listed below each category are utilized, the use of barriers as set forth in section IV herein is not required unless the NYC Department of Environmental Protection receives complaints as set forth in §28-102(C) of Title 15 of the RCNY for each device. If however, the specific devices listed below each main category of devices are not checked, and you are using any of the main devices listed below, then the use of barriers set forth in Section IV herein shall be utilized. However, if you specified “other” in a category, you shall be required to utilize barriers as set forth in Section IV herein.

 

DEVICE

 

PILE

JACKHAMMERS

HOE RAMS

 

BLASTING

VACUUM

DUMP

CRANES

 

CONCRETE

SANDBLASTING

AUGER DRILL

OTHER

 

 

 

 

_____________:

 

 

DRIVERS

 

EXCAVATORS

TRUCKS

 

SAWS

EQUIPMENT

RIGS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FOR:

Demolition

Demolition

Demolition

 

Demolition

Demolition

Demolition

Demolition

 

Demolition

Demolition

Demolition

Demolition

Excavation

Excavation

Excavation

 

Excavation

Excavation

Excavation

Excavation

 

Excavation

Excavation

Excavation

Excavation

Foundation

Foundation

Foundation

 

Foundation

Foundation

Foundation

Foundation

 

Foundation

Foundation

Foundation

Foundation

USED

Superstructure

Superstructure

Superstructure

 

Superstructure

Superstructure

Superstructure

Superstructure

 

Superstructure

Superstructure

Superstructure

Superstructure

Finishing

Finishing

Finishing

 

Finishing

Finishing

Finishing

Finishing

 

Finishing

Finishing

Finishing

Finishing

Other (Explain):

Other (Explain):

Other (Explain):

 

Other (Explain):

Other (Explain):

Other (Explain):

Other (Explain):

 

Other (Explain):

Other (Explain):

Other (Explain):

Other (Explain):

PHASE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAKE (s)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vibratory Pile

Quieter makes and

Quieter makes and

Blast Mats

Smaller Capacity

US Made European

Modern Hydraulic

 

 

 

 

 

 

 

 

Driver or Hydraulic

models as defined in

models as defined in

 

 

vac-truck as defined in

Environmental Label

Crane as defined in

 

 

 

 

 

 

 

 

Impact Pile Driver as

102(a)(2)(B)(i)

102(a)(3)(B)(i)

 

 

102(b)(1)(B)(i)

equipment or equivalent

102(d)(1)(B)(ii)

 

 

 

 

 

 

 

 

defined in

Other (Explain):

Noise Shroud as

 

 

Silencer as defined

as defined in

US Made European

 

 

 

 

DETAIL

102(a)(1)(B)(ii)

 

defined in

 

 

in 102(b)(1)(B)(iii)

102(c)(1)(B)(iii)

Environmental Label

 

 

 

 

 

Noise Bellows as

 

102(a)(3)(B)(iii)

 

 

Other (Explain):

Other (Explain):

equipment or equivalent

 

 

 

 

defined in

 

Other (Explain):

 

 

 

 

as defined in

 

 

 

 

 

102(a)(1)(B)(viii)

 

 

 

 

 

 

102(d)(B)(1)(iii)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Other (Explain):

 

 

 

 

 

 

Other (Explain):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FUEL TYPE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MAXIMUM NUMBER OF UNIT TO BE USED AT THE

SAME TIME:

 

 

 

ADDITIONAL CONSTRUCTION DEVICES

List of additional applicable construction devices to be used at the site:

GENERATORS

COMPRESSORS

STREET PLATES BACKUP ALARMS

PUMPS

HOIST

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOISE MITIGATION

 

 

 

 

 

Required to use Perimeter barrier /DOB construction fence or temporary/moveable barrier:

 

Noise Mitigation Barriers Utilized: If required as set forth in §28-101(g) of Title 15 of the RCNY.

 

 

 

YES

 NO

 

 

PILE

JACKHAMMERS

HOE RAMS

BLASTING

VACUUM

 

DUMP

CRANES

CONCRETE

STREET

AUGER DRILL

BACKUP

DRIVERS

EXCAVATORS

 

TRUCKS

SAWS

PLATES

RIGS

ALARMS

 

 

 

 

 

 

 

Perimeter

Perimeter

 

Perimeter

Perimeter

Perimeter

Perimeter barrier/DOB

Perimeter

Perimeter

Perimeter

Perimeter

Perimeter

barrier/DOB

barrier/DOB

 

barrier/DOB

barrier/DOB

barrier/DOB

Construction Fence

barrier/DOB

barrier/DOB

barrier/DOB

barrier/DOB

barrier/DOB

Construction Fence

Construction Fence

Construction Fence

Construction Fence

Construction Fence

Temporary barrier

Construction Fence

Construction Fence

Construction Fence

Construction Fence

Construction Fence

Temporary barrier

Temporary barrier

Temporary barrier

Temporary barrier

Temporary barrier

Moveable barrier

Temporary barrier

Temporary barrier

Temporary barrier

Temporary barrier

Temporary barrier

Moveable barrier

Moveable barrier

Moveable barrier

Moveable barrier

Moveable barrier

 

 

Moveable barrier

Moveable barrier

Moveable barrier

Moveable barrier

Moveable barrier

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 2 of 3

CHECK ALL THAT APPLY

Please check all equipment that will be used on site. Review Rules for Citywide Construction Noise Mitigation Section 28-109. Certify that equipment has been sound tested and complies with Spec 721.560 Lmax @50 ft.

LabelID

Equipment Description

 

LabelID

Equipment Description

 

LabelID

Equipment Description

 

A

All Other Equipment > 5 HP

 

 

T

Excavator

 

 

AM

Refrigerator Unit

 

B

Auger Drill Rig

 

 

U

Flat Bed Truck

 

 

AN

Rivet Buster / Chipping Gun

 

 

 

 

 

 

 

 

 

 

 

 

C

Backhoe

 

 

V

Front End Loader

 

 

AO

Rock Drill

 

 

 

 

 

 

 

 

 

 

 

 

D

Bar Bender

 

 

W

Generator

 

 

AP

Roller

 

 

 

 

 

 

 

 

 

 

 

 

E

Blasting

 

 

X

Generator (<25KVA, VMS signs)

 

 

AQ

Sand Blasting

 

F

Boring Jack Power Unit

 

 

Y

Gradall

 

 

AR

Scrapper

 

 

 

 

 

 

 

 

 

 

 

 

G

Chain Saw

 

 

Z

Grader

 

 

AS

Shears (on backhoe)

 

 

 

 

 

 

 

 

 

 

 

 

H

Clam Shovel (dropping)

 

 

AA

Grapple (on backhoe)

 

 

AT

Slurry Plant

 

 

 

 

 

 

 

 

 

 

 

 

I

Compactor (ground)

 

 

AB

Horizontal Boring Hydr. Jack

 

 

AU

Slurry Trenching Machine

 

J

Compressor (air)

 

 

AC

Hydra Break Ram

 

 

AV

Soil Mix Drill Rig

 

 

 

 

 

 

 

 

 

 

 

 

K

Concrete Batch Plant

 

 

AD

Impact Pile Driver

 

 

AW

Tractor

 

 

 

 

 

 

 

 

 

 

 

 

L

Concrete Mixer Truck

 

 

AE

Jackhammer

 

 

AX

Vacuum Excavator (Vac-truck)

 

 

 

 

 

 

 

 

 

 

 

 

M

Concrete Pump Truck

 

 

AF

Man Lift

 

 

AY

Vacuum Street Sweeper

 

N

Concrete Saw

 

 

AG

Mounted Impact Hammer (hoe ram)

 

 

AZ

Ventilation Fan

 

 

 

 

 

 

 

 

 

 

 

 

O

Crane

 

 

AH

Pavement Scarafier

 

 

BA

Vibrating Hopper

 

 

 

 

 

 

 

 

 

 

 

 

P

Dozer

 

 

AI

Paver

 

 

BB

Vibratory Concrete Mixer

 

 

 

 

 

 

 

 

 

 

 

 

Q

Drill Rig Truck

 

 

AJ

Pickup Truck

 

 

BC

Vibratory Pile Driver

 

R

Drum Mixer

 

 

AK

Pneumatic Tools

 

 

BD

Warning Horn

 

 

 

 

 

 

 

 

 

 

 

 

S

Dump Truck

 

 

AL

Pumps

 

 

BE

Water Jet Deleading

 

 

 

 

 

 

 

 

 

BF

Welder / Torch

 

 

 

 

 

 

 

 

 

 

 

Note: DEP will utilize the Federal Highway Administration Roadway Construction Model as a means of identifying equipment either in Section II or III, that may be the cause of a noise complaint, see §28-101(a) of Title 15 of the RCNY for compliance options.

By checking this box, I certify that the information contained in this form is true and accurate.

NAME

COMPANY

DATE

BUSINESS ADDRESS

CITY

STATE

ZIP

Page 3 of 3

Form Characteristics

Fact Name Details
Governing Authority This form is governed by Title 15 of the Rules of the City of New York, specifically Chapter 28.
Submission Requirement It is not necessary to file the Construction Noise Mitigation Plan with the Department of Environmental Protection (DEP).
Posting Requirement The plan must be posted on site or made accessible to inspectors at all times.
Responsible Party The responsible party is liable for the accuracy of the document and compliance with applicable rules.
Work Site Information Details required include the work site location, contact information, and approximate distance to the closest receptor.
Construction Phases The form outlines various construction phases, such as demolition, excavation, and finishing, with specific date ranges.
Noise Mitigation Devices Users must check applicable noise mitigation devices being utilized, including pile drivers and jackhammers.
Certification The responsible party must certify the accuracy of the information by signing the form, which also requires a notary public.
Please rate Fillable Nyc Dep Noise Mitigation Plan Form in PDF Form
4.79
Perfect
19 Votes